Centreville Road Bridge Preservation and Channel Stabilization

Forte & Tablada, Inc. provided structural engineering services for remediating the Centreville Road Bridge in Ramah, LA. The bridge experienced severe timber bulkhead decay and embankment loss. Forte and Tablada prepared plans to remove and replace the failing bridge components with new materials. The work included designing a new timber bulkhead, approach slabs, and channel stabilization.

 

Service

Location

Iberville Parish, LA

Related Projects

  • US Highway 80 Improvements (Traffic Street to Old Shad Road)

  • Buddy Ellis Overlay Project

  • Holly Drive Bridge Replacement

  • Johnson Koran Road Bridge Over Foxskin Bayou

Scroll to Top