Price LeBlanc PACE Performing Arts Center

Forte and Tablada performed the Electrical and Structural Engineering design for a new $17 million 25,000 SF performing arts and event center in Gonzales, LA. Design included electrical systems, special systems, shallow foundations, reinforced concrete masonry, and steel framing.

Key tasks include:

  • Electrical and Special Systems analysis and design, including security, alarm, and audio and video systems.
  • Structural analysis and design.
  • Design coordination with Architect, Owner, and Owner’s vendors.
  • Construction Administration services for the Electrical and Structural scopes of work.

Service

Location

Gonzales, LA

Related Projects

  • Louisiana Boardwalk

  • Pointe Coupee Drainage Master Plan and OCD/DRU Gustav/Ike Drainage Improvements

  • Benton Lane Improvements

  • Caddo-Bossier Port 100k SF Warehouse and Caddo-Bossier Port 40k SF Warehouse

Scroll to Top