Peak Lane Road Improvements

Forte and Tablada provided CE&I services for repairs and improvements of 0.468 miles of road on Peak Lane from its junction with Route US 190 (Florida Blvd.) to its junction with Route LA 1027 (Burgess Ave.). The work associated with this project included clearing and grubbing, drainage structures, milling asphalt concrete, pavement patching, in-place cement stabilized base course, lime treatment, asphalt concrete overlay, and related work.

Service

Location

Walker, LA

Related Projects

  • Sherwood-Goodwood Pipeline Project

  • East Baton Rouge Professional Development Building

  • Willis-Knighton – Pierremont Hospital Campus

  • George Mashon Rd. and Travis St. Bridge Replacements

Scroll to Top