Lod Stafford Road Bridge over Colyell Creek

Forte and Tablada provided surveying, engineering, hydraulic analysis, environmental, utility relocation, and construction related services required for the replacement of a 2-lane, 3-span timber bridge in Livingston Parish. The existing bridge on Lod Stafford Road over Colyell Creek is being replaced with a 24-foot wide 4-span curved & skewed slab span bridge with 16 inch piles. This work included the following tasks:

•                 Topographic Survey

•                 Hydraulic Analysis

•                 Civil Design & Construction Plans Preparation

•                 Bridge Design and Load Rating for a Curved Skewed Bridge

•                 Geotechnical Services

•                 Wetlands/Environmental Services

•                 Property Surveys & ROW Maps

Service

Location

Livingston Parish, LA