Forte and Tablada provided surveying, engineering, hydraulic analysis, environmental, utility relocation, and construction related services required for the replacement of a 2-lane, 3-span timber bridge in Livingston Parish. The existing bridge on Lod Stafford Road over Colyell Creek is being replaced with a 24-foot wide 4-span curved & skewed slab span bridge with 16 inch piles. This work included the following tasks:
• Topographic Survey
• Hydraulic Analysis
• Civil Design & Construction Plans Preparation
• Bridge Design and Load Rating for a Curved Skewed Bridge
• Geotechnical Services
• Wetlands/Environmental Services
• Property Surveys & ROW Maps