Sims Road Improvements

Forte and Tablada provided comprehensive services for repairs and improvements to a main connection between LA 16 and Renniger Road.  The improvements were necessary due to a failing roadway and the road was too narrow.  Services included surveying, environmental, engineering design, and construction engineering and inspection to provide an overlay and closed drainage in order to support higher traffic volumes and lateral support of the pavement.

Service

Location

Walker, LA

Related Projects

  • Old Hammond Highway – Segment 1

  • Groom Road (LA 19 to Plank Road) Widening and Drainage Improvements

  • Improvements to the Westwego Pump Station No. 1

  • Bridges near Bluff Creek LA 63

Scroll to Top