Johnson Koran Road Bridge Over Foxskin Bayou

Forte and Tablada provided Surveying, engineering, and hydraulic analysis services required for improvements of the bridge on Johnson Koran Road over Foxskin Bayou. This work included the following tasks:

  • Topographic Survey
  • Hydraulic Analysis
  • Civil Design & Construction Plans Preparation
  • Drainage Structures
  • Geotechnical Services
  • Wetlands Issues
  • Property Surveys & Right-of-Way Maps
  • Pre-Cast Concrete Slab Span Bridge (140’ Long)

Service

Location

Bossier Parish, LA

Related Projects

  • Shreveport Convention Center

  • LCDBG-CV Love Louisiana Outdoors Program Batchelor Park and False River Park Enhancement Project

  • Improvements to the Westwego Pump Station No. 1

  • Camp Minden Regional Training Institute

Scroll to Top