Sligo Road Bridge Over Foxskin Bayou

Forte and Tablada provided surveying, engineering, and hydraulic analysis services required for improvements of the bridge on Sligo Road over Foxskin Bayou. This work included the following tasks:

  • Topographic Survey
  • Hydraulic Analysis
  • Civil Design & Construction Plans Preparation
  • Geotechnical Services
  • Wetlands/Environmental
  • Property Surveys & Right-of-Way Maps
  • Pre-Cast Concrete Slab Span Bridge (140’ Long)
  • Construction Phase Services

Service

Location

Bossier Parish, LA

Related Projects

  • US Highway 80 Improvements (Traffic Street to Old Shad Road)

  • Westbank Closure Complex

  • Warsaw and Blood River Landing Sewer System Upgrade

  • Delta and Carville Sewer System Improvements

Scroll to Top