Livingston Parish Drainage Improvements and Bridge Replacements

Forte and Tablada was responsible for the preliminary study to determine the feasbility of replacing seven timber bridges andĀ culverts within the parish. Drainage areas were determined for each bridge and storm runoff was calculated. Services also included in this contract is surveying, wetland delineation, preliminary and final design plans, permitting services, hydraulic analysis, and construction inspection. Forte and Tablada was alsoĀ responsible for putting together construction documents and bidding the project.

 

Service

Location

Livingston Parish - various locations

Related Projects

  • Sherwood-Goodwood Pipeline Project

  • Louisiana Boardwalk

  • LCDBG-CV Love Louisiana Outdoors Program Batchelor Park and False River Park Enhancement Project

  • Welcome Center at Southern University

Scroll to Top